The planned power outage at UH Energy Research Park 3 (403) has completed. One module on an access switch in IDF 280A did not recover from the power outage. Technician investigated and reports the module has failed. The access switch will be replaced. The estimated time to repair is unknown.
Resolved - Network Service Disruption in ERP3
April 30, 2017
,
1:49 PM
The access switch ERP3 IDF 280A has been replaced. Network services have been restored.